Cover of The Banco Central Tunnel: Engineering the Largest Tunnel Heist

The Banco Central Tunnel: Engineering the Largest Tunnel Heist

by Barnaby Devereaux

Part of Heists

Choose a format

Have a discount or gift code?

    📖 Look inside

    ★ Included with Membership: stream the audiobook or read the eBook online.

    About this book

    Examines the precise engineering and construction of the 260-foot tunnel used in the Fortaleza heist, including its shoring, lighting, and ventilation.

    Listen to a sample

    Narrated, technical. Running time 3 h 28 min. Delivered as MP3 chapter files you can play on any device.

    Book details

    Genres
    True Crime, Engineering, Heist
    Audience
    Adult
    Mood
    Technical, fascinating
    Year
    2005
    Publisher
    NFT Publishing

    Reviews

    No reviews yet. Be the first.

    You might also like